Campus Wide Renewal Underway at Sutter Health CPMC Campuses

The scope of work for the CPMC Davies Campus and Pacific Campus Renewal Projects included renovation of the areas and departments listed below.

  • Inpatient Behavioral Health project, including demolition of the existing finishes for the entire 3rd floor of the South Tower. Build-out of an 18-bed Behavioral Health unit, requiring coordination with managers on all floors above and below in the occupied hospital tower
  • PACU expansion
  • Loading dock upgrades for SPC4 requirements, including an egress tunnel to/from North Tower (with 18 micro-piles to bedrock)
  • Emergency Department remodel, broken into four phases to minimize disruption and maintain occupancy
  • Outpatient Family Medicine clinic, above a 7-days-per-week operating Dialysis Clinic
  • New entryway to the Emergency Department, which entailed saw-cutting a new opening, tightly choreographed due to adjacencies to occupied patient wings
  • Renovation of several areas throughout the hospital to ready the campus to meet NPC4, RACS and licensing requirements through Jan 1, 2030
  • New men and women's staff locker rooms
  • Pathology Lab and Conference/Research Space
  • Patient Room ADA upgrades
  • Relocation of main hospital admitting lobby
  • Back-of-house Dietary upgrades
  • Outpatient Ob-Gyn offices, including Mammography Suite